Logo 2 Image




Projects

MedaMos Project

Project Descreption:

Technical Assistance program was launched and included the following:

Logistics Efficiency Improvements Study of Aqaba Port to determine logistic congestion and develop practical solutions thereof based on a study of the top 10 containerized goods, including two goods flowing to Aqaba through Genoa port. The study was completed in July 2013.

ECHO Port Pilot Project study for the application of “Environment Management System” in Aqaba Container Terminal during 2013 through the application of an evaluation plan of environmental aspects and effects at the port level and reaching practical recommendations for procedures and arrangements required for joining environmentally friendly international ports.

Participation in many different regional, technical and training workshops had been made.

Project Status:

Accomplished / project final report was delivered .

 

How do you rate the content of the page?